Mounting the ventilation unit to the ceiling
Vallox 99 MV can be equipped with an optional ceiling mounting plate. Attach the ceiling mounting plate:
- On rafters or other frame structures with M8 thread bars so that they withstand the weight of the unit.
- Ensure that the mounting plate is horizontally level, as this determines the position of the unit.
- The top edge of the white covering strip of the ceiling mounting plate can be installed against the ceiling. Alternatively, a concealed mounting method can be used, in which case the ceiling can be 30 mm below the top edge.
Insulate the channels against condensation also between the unit and the ceiling mounting plate.
Note:
When installing the unit, reserve a space of at least 500 mm in front of the unit for servicing purposes.
Note:
Install the ventilation unit in a place where the temperature does not drop below +10°C.

- Attach the ceiling mounting plate:
- Fasten the thread bars on the rafters or other frame structure and screw the nuts (E) onto the bars.
- Lift the ceiling mounting plate in place.
- Push a rubber damper (F) and a washer (G) to each thread bar.
- Adjust the nuts so that the ceiling mounting plate is level.
- Shorten the lower ends of the thread bars so that they fall no more than 5 mm below the nuts.
Warning:The unit is very heavy. Do not perform the task alone. - Install the ventilation unit on the ceiling mounting plate:
Attic floor feedthrough plate
The attic floor penetration plate (D) is optional. When an insulated attic floor penetration plate is used, the airtightness of the vapour barrier must be ensured.
The attic floor penetration plate can be fastened on the finished rear wall. The minimum distance of the attic floor penetration plate from the finished side walls is 15 mm.
